Mitsubishi Electronics FX-PCS-DU/WIN-E Model Vehicle User Manual


 
FX Series Programmable Controllers
Object Function Description 8
8-100
7 ) Frame
Specifies the type of the frame in which the alarm list is displayed.
* When "no frame" is selected, a dotted-line frame is displayed in the DU/WIN-E software, and no frame
is displayed in the DU and the F940GOT.
8 ) Store Screen Data (Do not set this item for the F920GOT.)
Click to select this item to store the date and time at which a bit device turns ON while another screen is
displayed from the screen with the alarm list in accordance with the setting of "9) Date and Time".
9 ) Date and Time
Click to select this item to display the date and time at which bit devices turn ON together with comments.
(Do not set this item for the F920GOT.)
10 ) Scroll
Click to select this item to scroll pages of the alarm list upward and downward by pressing touch keys.
While this item is not selected, the cursor can be moved upward and downward on the currently
displayed page.
Difference in operation between page scrolling and cursor movement
[While the cursor is not displayed]
[While the cursor is displayed]
When moving the cursor upward or downward or displaying or hiding the cursor, touch keys (key codes)
should be created.
Table:8.45
Display form
No frame Single frame Double frame (keyboard) Double frame (trimmed)
Table:8.50
Operation Moves cursor upward. Moves cursor downward. Displays cursor. Hides cursor.
Key code FFB2 FFB3 FFB0 FFB1
Option
Screen changeover
M5 turns ON at 00/5/31 14:00:33.
Screen
Alarm
When screen
data is stored
00/5/31 12:00:15 Conveyor checkM1
M2
00/5/31 13:30:25 Product check
M1
M2
00/5/31 12:00:15 Conveyor checkM1
M2
00/5/31 13:30:25 Product check
M1
M2
00/5/31 14:00:33 Conveyor errorM5
Screen changeover at 00/05/31 14:14:00
When screen data
is not stored
00/5/31 12:00:15 Conveyor checkM1
M2
00/5/31 13:30:25 Product check
M1
M2
00/5/31 14:14:00 Conveyor errorM5
Date and time displayed in alarm listDate and time at which M5 turns ON
3) Check conveyor.
4) Inspect.
Up Down
Up
1) Check line 1.
2) Check line 2.
Up Down
3) Check conveyor.
4) Inspect.
Down
1) Check line 1.
2) Check line 2.
Up Down
3) Check conveyor.
4) Inspect.
Down
1) Check line 1.
2) Check line 2.
Up Down
Down
1) Check line 1.
2) Check line 2.
Up Down
*
2) Check line 2.
3) Check conveyor.
Up Down
2) Check line 2.
3) Check conveyor.
Up Down
Up