60 TPS-System 1000 Programs-2.3.1en © Leica
IV
EL
AH
OH
BS
SM
SO
Coarse Positioning
Once the coordinates of the stakeout point have been
acquired, the program proceeds to "Coarse
Positioning". This option is available to direct the prism
from the previous point placed to the next.
The "Coarse Positioning" calculates various
displacements, depending on the method selected.
Displacements are computed between the last point
placed and the actual stakeout point selected. For more
information refer to chapter "Stakeout".
Line Offset
The stakeout values of each point are computed in
relation to the base formed by the last two points.
If the elevation is known for the point to be staked out,
the height difference in relation to the last base point
(Pt2), is displayed. In particular, this method is
advantageous for long objects (traffic routes). Values
for positioning are only displayed after two stakeout
points.
PROG_Z05
N0
H
N
Pt1
Pt2
Line
Pt3 ... point to be staked
∆Height
E
Pt3
Offset
E0