© Leica TPS-System 1000 Programs-2.3.1en 153
IV
EL
AH
OH
BS
SM
AS
FS
BL
HB
KM
FB
SA
TR
Occupy station
The instrument is set up for a new traverse point or
sideshot. The angle measurement (distance
measurement is optional) is made to a tie point or to the
last traverse point. This dialog corresponds to the TPS-
System 1000 basic dialog. After the function has been
performed, the station coordinates and orientation are
set in the instrument.
TRAV\ OCCUPY TRAVERSE PT
14:03
MC
ALL DIST REC TARGT SS
Slope Dist. : ----- m
Height diff : ----- m
Easting : ----- m
Northing : ----- m
Elevation : ----- m
F1
F2 F3
F4
F5 F6
HELP I<>II
Station no. : 2
Backsight : 1
Inst.Height : 1.300
Refl.Height : 1.300 m
Hz : 249°10'20"
V : 90°19'52"
Station no. : Station point number.
Backsight : Backsight to tie point.
Simultaneously measure and record data on the active
recording device.
Measure a distance
1
and record data on the active
recording device.
Measure a distance without recording.
Enter target data as described in chapter "Measure &
Record" of "SYSTEM" - user manual.
1
Distance measurement is optional.