Leica 1000Z01 Model Vehicle User Manual


 
106 TPS-System 1000 Programs-2.3.1en © Leica
IV
EL
AH
OH
BS
SM
AS
FS
BL
RH
Measure Base Point
This dialog is used in accordance with the settings of
the system function "Measure & Record" or according
to the dialog shown below.
REMHT\ MEASURE BASE PT
14:03
ALL DIST REC TARGT REMOT αNUM
F1
F2 F3
F4
F5 F6
Point no. : Station12
Hz : 16°55'50"
V : 91°16'20"
Refl.Height : 1.664 m
Slope Dist. : ----- m
Height diff : -----
HELP CONF I<>II
Point No. : The point number of the base point.
Hz : Horizontal direction from the remote
point to the base point.
V : Vertical angle to the remote point.
Refl.Height : Reflector height used for the target
point.
Slope dist. : Slope distance from the instrument
station to the base point.
Height diff : Height difference between the base
point ground and the instrument
ground.
Simultaneously measure and record in the active file.
Proceed with the "REMOTE POINT" dialog.
Measure a distance. Record the measurement in the
active file and proceed with the "REMOTE POINT"
dialog.
Measure the distance. Accept the measurement without
recording. Proceed with the "REMOTE POINT" dialog.
MC