© Leica TPS-System 1000 Programs-2.3.1en 197
IV
EL
AH
OH
BS
SM
AS
FS
BL
HB
KM
FB
SA
PZ
RO
The project start is at the nadir. After the first straight
there follows a left curve, then a right curve. There are
also spirals and a straight between the arcs.
The cross sections are assigned as follows:
Straight Tmpl0125
Left curve Tmpl0123
Right curve Tmpl0124
The last character at the end of each data line must be a
space (ASCII character 32).
WI 11 and WI 41: The block number is located from
position 3 to 6.
of the geometrical elements. The starting point of one
element is also the finishing point of the previous
element.
• V-alignment
The V-alignment definition (= V-alignment)
The V-alignment is defined with the main points (1 - 6).
The main points form the starting and finishing points
PROG_Z23
1
2
3
4
5
6
Straight Straight Straight
Parabola
+p
Parabola
-p