AT&T 2.1.1 Riding Toy User Manual


 
Software Installation
12.
13.
14.
15.
Press [F3] (SAVE).
— A confirmation message appears that the printer you
selected is set upon the port you selected. The printer
is also set up as your default printer destination.
Press [F3] (CONT).
— The Printer Setup menu displays.
Press [F6] (CANCEL) until the AT&T FACE menu displays.
Highlight
Exit
and press [F3] (CONT).
Completing Installation
At this point, all of the hardware and software components of the AUDIX
Voice Power system are installed. However, the AUDIX Voice Power
system is not operational until AUDIX Voice Power and the switch are
administered.
Acceptance Testing
Acceptance testing demonstrates that the system works. It consists of
running hardware diagnostics to verify that the hardware is installed
properly and that the hardware works, and then using a small sample
population of users to verify that the software is installed property and
that the software works properly.
To perform the acceptance testing, you need to have the switch and
AUDIX Voice Power administered. The administration of the switch, and
of any existing AUDIX Voice Power system, must be left to the customer
and arranged so as not to interfere with the customer’s business.
The administration of any new AUDIX Voice Power system should be
undertaken jointly with the customer so as to familiarize the customer
with the process.
3-43