Emerson 700 XA Card Game User Manual


 
Appendix B
Carrier gas installation and maintenance
B.1 Carrier gas
This appendix provides a description of the optional carrier manifold (P/N 3-5000-050)
that permits the connection of two carrier gas bottles, or cylinders, to a gas
chromatograph (GC) system. The benefits of this manifold are as follows:
Note
The illustration and information in this appendix are adapted from drawing AE-10098.
When one bottle is nearly empty (i.e., 100 psig remaining), the other bottle
becomes the primary supply.
Each bottle can be disconnected for refilling without interrupting GC operation.
Manifold for two carrier gas bottles to GC systemFigure B-1:
Carrier gas installation and maintenance
B
Carrier gas installation and maintenance
175