Mitsubishi Electronics SW8D5C-GPPW-E Child Tracker User Manual


 
5 - 43 5 - 43
5 ADDED FUNCTIONS TO CORRESPOND TO A SAFETY
PROGRAMMABLE CONTROLLER
MELSOFT
(3) Communication Test
Admin. Develop. Users
SAFETY
TEST
[Purpose]
Executes the communication test between CC-Link IE Field Networks.
[Operating Procedure]
Select [Diagnostics]
[CC IE Field Diagnostics] Communication Test button.
[Dialog Box]
Presence or absence of
errors on the
communication test
2)
1)
3)
4)
5)
[Description]
1) Connected Station (Own)
Displays the network number and station number of the connected station.
2) Target Station
Set the network number and station number.
3) Communication Data Setting
Set the data length (1 to 900 bytes), the number of communications (1 to 100
times), and monitoring time (1 to 100 seconds) to execute the test.
4) Execute Test
button
Executes the communication test in accordance with the settings.
5) Communication Test Result
Displays the result of inter-network communication test.
Also in 'Presence or absence of errors on the communication test', displays
whether the communication test has been executed normally.
Networks and stations routed from the connected station (own station) to the
target station are displayed in the <<Outward>> tab and those routed from the
target station to the connected station (own station) are displayed in the
<<Inward>> tab.