Mitsubishi Electronics SW8D5C-GPPW-E Child Tracker User Manual


 
5 - 12 5 - 12
5 ADDED FUNCTIONS TO CORRESPOND TO A SAFETY
PROGRAMMABLE CONTROLLER
MELSOFT
POINT
The wait time for the automatic operation lock is counted while the GX Developer
has not been operated, and is reset when operating the GX Developer.
However, the wait time is not reset in the following operations.
<Selecting a menu item when a pull-down menu is displayed>
Example) When displaying the pull-down menu of the Project
Pull-down menu
<All the operations when a message box is displayed>
Example) The message box displayed when exiting the GX Developer
<All the operations when a dialog box is displayed>
Example) When the New Project dialog box is displayed
Note when the key/mouse operation outside the open dialog box is enabled
(Designated as a modeless dialog box), the monitoring time is reset.
Example) When the "Cross reference list" dialog box is displayed
Cross reference list
dialog box
Unlocking the operation lock enables to operate the GX Developer. (
(3) in
this section)
When saving the project, the set wait time is treated as project data.
The monitor screen displayed before the operation lock keeps updated even
during operation lock.