3Com S24x Crib Toy User Manual


 
2-12 Preparation and Unpacking
Installing the PathBuilder S24x, 26x, and 27x Switch in an Equipment Rack
Installing the PathBuilder S24x, 26x, and 27x Switch
Figure 2-4 shows the installation of the PathBuilder S24x, 26x, and 27x switch in the
rackmount assembly.
Figure 2-4. Installing the PathBuilder S24x, 26x, and 27x Switch in Rack-
mount Assembly
PathBuilder S24x, 26x, and 27x switch
Mounting Shelf
Slide the PathBuilder S24x, 26x, and 27x
reinsert long screws through rail and into
Attached Rear Mounting brackets
are not shown in this figure.
Remove the three case-fastening screws
off the left rear (new bottom) of
A
B
Note:
(Rear View)
switch flush against rear mounting rail and
machine’s case.
PathBuilder S24x, 26x, and 27x
switch.