3Com S24x Crib Toy User Manual


 
2-4 Preparation and Unpacking
Unpacking
Unpacking
Introduction The PathBuilder S24x, 26x, and 27x switch’s printed circuit cards and other internal
components are installed in the enclosure before the unit is shipped from the factory.
In addition to the enclosure and its components, you may find within the shipping
carton a sleeve containing the power cord (if appropriate for your installation).
Checking the
Equipment
Thoroughly check the cartons and their contents for damage in shipment.
If damage has occurred, contact the shipping agent.
Next, lift the unit from the shipping carton and remove the foam packing material.
Direct any questions about missing parts to your 3Com representative.