Mitsubishi Electronics A1SD75P1-S3/P2-S3/P3/S3 Model Vehicle User Manual


 
11 - 36 11 - 36
MELSOFT
11. POSITIONING DEBUGGING
11.2.5 OPR test
PURPOS
E
Make the OPR test to correct the OPR basic and extended parameters and set up
the original point.
BASIC OPERATIO
N
1. Perform the basic operation in Section 11.1.2 to start operation monitor.
2. Click the [Online] [Test] [Test start] menu (
).
3. Click the "OK" button in the test mode start confirmation dialog box.
4. Click the "Ope. Test" button on the operation monitor main screen.
5. Click the <<OPR>> tab in the Test data set dialog box.
6. Perform the OPR test.
7. To end the OPR test, click the [Online] [Test] [Test start] menu (
).
8. Clicking the "OK" button in the test mode end confirmation dialog box returns to
the operation monitor status.
DISPLAY/SETTING SCREEN