Sterling 882.00255.00 CV3-655 Musical Table User Manual


 
24-Pump, 128-Station Controller Chapter 3: Installation 20
To secure the seal block:
1. Start the threads of each of the four captive screws into the cable base receptacle
holes.
2. Drive each of the screws about halfway down, using the proper torque sequence:
Bottom screw, top screw, left screw, right screw. Doing so insures that the cables are
pierced evenly.
3. Using the proper torque sequence, tighten each screw, a little at a time, until the
seal block is fully seated into the cable base. Tighten to no more than 8 to 10 inch-
pounds (3.0 to 3.7 N
m) of torque.
The three seat lines on the seal block should meet the cable base, indicating that the
seal block is fully seated. The seal block clips should also click into place onto the
corresponding cable base slots.
Installing KwikLink™ Connectors
KwikLink connectors let you connect the controller and the power supply to the system. They
are also used to electronically terminate power cable and data cable runs.
Just like ArmorBlocks, KwikLink connectors are insulation displacement connectors (IDCs).
Caution! Exercise care when installing Kwiklink connectors.
IDC blades on KwikLink connectors are SHARP!
Gently push back any protruding IDC blades before installing flat cables
inside.
The KwikLink connector should already be attached to the mounting plate, so the hinge side
is down. If not, reinstall it with its proper alignment, along the correct flat cable. See the
installation drawing located in your Customer Information Packet for further details.
To install flat cable inside KwikLink connectors:
1. Lay the cable in the hinged base, noting the correct keyed profile; flat edge toward
the hinge, keyed edge toward the latch. Make sure that the cable is properly seated
inside.