Mitsubishi Electronics AD75M1/M2/M3 Model Vehicle User Manual


 
11 - 33 11 - 33
MELSOFT
11. POSITIONING DEBUGGING
11.2.4 Speed change test
PURPOS
E
In the speed change test, speed change is made to the positioning start, OPR or
JOG operation test by the operation test of GX Configurator-AP to confirm the
proper speed.
BASIC OPERATIO
N
1. Perform the basic operation in Section 11.1.2 to start operation monitor.
2. Click the [Online] [Test] [Test start] menu (
).
3. Click the "OK" button in the test mode start confirmation dialog box.
4. Click the "Ope. Test" button on the operation monitor main screen.
5. Start the positioning start test in the Test data set dialog box.
6. Click the <<Speed change>> tab in the Test data set dialog box.
7. Conduct the speed change test on the axis being operated in the positioning
start test.
8. To end the speed change test, click the [Online] [Test] [Test start] menu (
).
9. Clicking the "OK" button in the test mode end confirmation dialog box returns to
the operation monitor status.
DISPLAY/SETTING SCREEN