Sterling SSL Card Game User Manual


 
26
6 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
BLOWBACK
ON ON ON ON
PULSES OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF
OPEN OPEN OPEN OPEN
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
6
ON ON ON ON ON ON ON ON
BLOWBACK OFF OFF OFF OFF OFF OFF OFF OFF
PULSES OPEN OPEN OPEN OPEN
7
BLOWBACK 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
PULSES
ON ON ON ON ON ON ON ON
OFF OFF OFF OFF OFF OFF OFF OFF
OPEN OPEN OPEN OPEN
7
BLOWBACK 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
PULSES
ON ON ON ON ON ON ON ON ON ON ON ON
OFF OFF OFF OFF
OPEN OPEN OPEN OPEN
Note: Figure 9 contains two (2) different programs (6 and 7
blowback pulses).
4-6 Shutting Down the Hopper Loader Using the Series One
Controller
Move the power switch on the Series One graphic panel to the OFF
position. For maintenance or for a long-term shutdown, unplug the
unit from the power source and shut off the compressed air supply.
-Notes-
15 SECONDS 10 SECONDS 20 SECONDS 25 SECONDS
30 SECONDS 35 SECONDS 40 SECONDS 45 SECONDS
50 SECONDS
55 SECONDS 60 SECONDS 70 SECONDS
80 SECONDS 90 SECONDS 100 SECONDS 120 SECONDS
Figure 8: Conveying Dip Switch Chart, Program A0536814
SSL/CSL 06, 11, 23 and 45 and SSIL/CSIL 06 and 11 Models