Sterling SSL Card Game User Manual


 
17
Chapter 3: Installation
3-1 Work Rules
Install, operate, and maintain this equipment according to all applicable work and safety codes.
This includes, but is not limited to: OSHA, NEC, CSA, and any other local, national, and
international regulations. Obey these specific work rules:
; Read and follow these instructions when installing, operating and
maintaining this equipment. If the instructions become lost or
unreadable, obtain a new copy from the manufacturer.
; Only qualified persons should work on or with this equipment.
; Work only with approved tools and devices.
; Disconnect and lock out electric power before maintaining or
servicing a hopper loader. If the unit is installed with a power cord
that can be unplugged, unplug it. If the unit is permanently wired to a
power main, have a fused power disconnect, capable of being locked
in the OFF position, installed.
3-2 Safety Considerations
; Connect the hopper loader to a grounded three-prong power
receptacle. If this is not possible, ground the hopper loader motor for
electrical isolation and protection from electric shock.
; Do not use hopper loaders in explosive atmospheres.
; Do not use outdoors or in wet environments. Moisture damages the
motor and can create an electric shock hazard.
; Operate hopper loaders at the rated voltage. Operation at other than
design voltage can result in, at best, poor performance, and can cause
damage to the vacuum motor, control, and personnel.
3-3 Necessary Tools
; Hand drill
; Pop-rivet gun
;
3
/16” (about 4.8 mm) -diameter rivets
3-4 Mounting SSL/CSL and SSIL/CSIL Hopper Loaders
You can mount your SSL/CSL or SSIL/CSIL hopper loader directly to the processing machine
by cutting a hole in the machine bin lid and fastening the hopper loader to it. The hopper
loader mounting flange mates with the equipment and uses the same mounting holes as
previous models.