Sterling Plumbing scc2 Musical Table User Manual


 
2–Pump 20-Station Controllers Operation 31 of 51
Starting and Stopping the System
WARNING! In an emergency, you can use the power switch at the controller
cabinet if a password is required to stop the system and you do not
know the password.
Note: Normally, all the stations and pumps you want to use should be enabled before you
start the system. When the system is stopped, icons for enabled stations are blue and
icons for enabled pumps are yellow. Enabling stations and pumps is described on
p. 303.
A button to start and stop the system is located in the lower right of the “Station Status” and
“Pump Status” screens. When the system is off, the button is red and reads Push to Start
System. When the system is on, the button is green and reads Push to Stop System.
Depending on the setup at your facility, the system may prompt for a password when you
touch this button.
Note: If conveying does not begin when you start the system, check to make sure that all
needed pumps are enabled. If they are, check that all needed stations are enabled.
Reviewing and Adjusting Basic Station Settings
The 2-pump, 20-station controller has a “Station Operator” screen for each station, as shown
below. This screen enables you to review and adjust all basic settings for the station.
To reach the “Station Operator” screen, complete the following steps:
1. Go to the “Station Status” screen, if needed. To reach this screen from any other
screen, touch Menu, and then touch Stations.
2. Touch and hold the icon for the station, until the controller either prompts for the
password or displays the “Station Operator” screen. Once you have entered the
password (if needed), the “Station Operator” screen appears.
Figure 16: “Station Operator” Screen
Settings in the box labeled Convey, the red Priority Convey Activate button, and the
menu controls on the right-hand side of the screen appear for all stations. Buttons in light
gray are settings that you can adjust at this screen. Boxes in dark gray are for display only. If
a pump assignment needs to be changed, this must be done at the “Station Setup” screen.