Hopper Loaders with/without Sight Glasses 26
to enter the value. The keypad disappears, and the “System Setup” screen shows the
new setting.
3-6 Initial Startup
Once you have finished all the setup described above, you are ready to start the system. To
start your system, complete the following steps.
1. At any screen, touch Menu on the right side of the screen. The “Menu” screen
appears (Figure 3).
2. Touch Stations. The “Station Status” screen appears (Figure 6).
3. For each station that you want to use, briefly touch its icon. The icon turns blue,
indicating that the station is ready, or the icon turns yellow, indicating that the station
needs material.
4. Touch Pumps. The “Pump Status” screen opens (Figure 10)
5. For each pump that you want to use, briefly touch its icon. The icon turns blue,
indicating that the pump is ready.
6. Touch Push to Start System in the lower right-hand corner of the screen.
7. The system starts. If any alarm messages appear on the screen, see p. 436.