Mitsubishi Electronics AD75P1-S3/P2- S3/P3-S3 Model Vehicle User Manual


 
11 - 27 11 - 27
MELSOFT
11. POSITIONING DEBUGGING
HELPFUL OPERATION (2)
To carry out operation per positioning data, perform the following operation.
1. Perform the basic operation steps 1 to 4 to display the Position data test set
dialog box.
2. Choose "Every Data No. Step" in Condition in the Position data test set dialog
box.
3. Set the positioning data No. axis-by-axis to Start point in the Position data test
set dialog box.
4. Click the "OK" button.
5. Choose the axis to be started and click the "Start" button in the Test start/set
dialog box to start operation with the positioning data No. set to Start point.
6. If the started positioning data pattern is other than "End", clicking the "Step
startup" button starts operation with the next positioning data No.
7. To end the positioning data test, click the "Exit" button.