Genie Z-45/25 Riding Toy User Manual


 
Part No. 52421 Genie Z-45/25 & Genie Z-45/25J 11
Operator's ManualFirst Edition · Seventh Printing
PRE-OPERATION INSPECTION
Pre-operation Inspection
o
Be sure that the operators, safety and
responsibilities manuals are complete, legible
and in the storage container located in the
platform.
o
Be sure that all decals are legible and in place.
See Decals section.
o
Check for engine oil leaks and proper oil level.
Add oil if needed. See Maintenance section.
o
Check for hydraulic oil leaks and proper oil level.
Add oil if needed. See Maintenance section.
o
Check for engine coolant leaks and proper level
of coolant. Add coolant if needed. See
Maintenance section.
o
Check for battery fluid leaks and proper fluid
level. Add distilled water if needed. See
Maintenance section.
o
Z-45/25 RT and Z-45/25J RT models: Check for
proper tire pressure. Add air if needed. See
Maintenance section.
Check the following components or areas for
damage and improperly installed, loose or missing
parts:
o
Electrical components, wiring and
electrical cables
o
Hydraulic hoses, fittings, cylinders and
manifolds
o
Fuel and hydraulic tanks
o
Drive and turntable motors and drive hubs
o
Boom wear pads
o
Tires and wheels
o
Engine and related components
o
Limit switches and horn
o
Alarms and beacons (if equipped)
o
Nuts, bolts and other fasteners
o
Platform entry mid-rail or gate
Check entire machine for:
o
Crack in welds or structural components
o
Dents or damage to machine
o
Be sure that all structural and other critical
components are present and all associated
fasteners and pins are in place and properly
tightened.
o
After you complete your inspection, be sure that
all compartment covers are in place and
latched.