Hoshizaki F-300BAF Inflatable Bouncy Toy User Manual


 
43
10) Replace the panels in their correct positions.
11) Plug the unit back in.
G. Removal and Replacement of Fan Motor
1) Unplug the unit from the electrical outlet.
2) Remove the panels.
3) Remove the wire connectors from the fan motor leads.
4) Remove the fan motor bracket and fan motor.
5) Install the new fan motor.
6) Replace the fan motor bracket and the wire connectors.
7) Replace the panels in their correct positions.
8) Plug the unit back in.
H. Removal and Replacement of Inlet Water Valve
1) Unplug the unit from the electrical outlet.
2) Remove the panels.
3) Close the water supply line shut-off valve.
4) Disconnect the terminals from the water valve.
5) Loosen the tting nut on the water valve inlet, and remove the water valve. Do not lose
the packings inside the tting nut.
6) Remove the water supply hose from the water valve.
7) Install the new water valve.
8) Assemble the removed parts in the reverse order of the above procedure.
9) Open the water supply line shut-off valve.
10) Check for water leaks.
11) Replace the panels in their correct positions.
12) Plug the unit back in.
I. Removal and Replacement of Flush Water Valve
1) Unplug the unit from the electrical outlet.
2) Remove the panels and close the water supply line shut-off valve.
3) Remove the clamp and disconnect the water valve.
Note: Water may still remain inside the evaporator. Be sure to drain the water into the
drain pan.
4) Disconnect the terminals from the water valve.
5) Remove the water valve from the bracket.
6) Remove the drain pipe from the water valve.
7) Connect the drain pipe to the new water valve, and place the valve in position.