1.3 Underground Conduit Requirements
1.4 Pad Mount
The conduit requirements are for a typical swing gate operator installation (the secondary operator is shown for
those applications where a secondary operator may be used). The conduit requirements for your application may
vary from this depending on your specific needs.
Use only sweeps for conduit bends. Do not use 90° connectors as this will make wire pulls very difficult and can
cause damage to wire insulation.
We suggest that minimum 3/4-inch conduit be used to protect wires from the elements.
Be sure that all conduits are installed in accordance with local codes.
Low Voltage Control and/or P.A.M.S. Wires
Primary/Secondary Interconnection Cable (Dual Operator Application Only)
Low Voltage Loop Lead-In Wires
High Voltage Power
Sweeps
Concrete Pad
3/4 Inch Minimum
Primary
Operator
Position
Secondary
Operator
Position
22”
24”
25”
90°
Depth of the concrete pad is
determined by soil conditions and
local building codes. Reinforced
concrete recommended.
Note: If allowed by local codes, the
top of the concrete pad can be flush
with ground level, which will allow
the gate bracket to be mounted
lower on the gate.
Arm
Rotation
Area
Gate Bracket Height
Concrete Pad Position
3/8
Secure the operator to the
concrete pad with four (4)
3/8” x 3” sleeve anchors
(not supplied).
Never run high voltage and low voltage wires in the same conduit.
Note: 2” thick gate Illustrated.
Closed Gate
Open Gate
3”3”
2.5”
2.5”
Right Support Leg
Left Support Leg
3”
Operator MUST
be level.
Note: Right support leg removed from
this illustration to show conduit detail.
Low
Volt
High
Volt
Interconnection
Cable
These measurements will work for standard or
convenience open models from 1.1 layout on page 10 ONLY.
9.5”
Conduit