OPERATION
Safety Checks Before Operation
Carefully inspect the lift before operating the tool each time.
Inspect the tool for wear or damage. Pay special attention to any wear or damage to
the cable.
Allow the lift to reach room temperature before operation.
Be sure the Winch Brake Hub (33) is clean and dry before operation.
Loading a Drywall Panel
Please note: Drywall panels are very heavy; it is recommended that they be handled
by two able workers. Set the Backstop (7) to prevent the Lift from moving or rolling
while you are loading a panel on it.
Rotate the Cradle (41) so the Support Hooks
(62) are on the opposite side of the tool from
the Winch Wheel (27). Fold the Support Hooks
down.
Extend the Outriggers (44) as needed to support
the panel size you are working with
Release the Tilt Latch (47) and tilt the Cradle.
Place the drywall panel on the Cradle, with the
face side of the panel facing the cradle. Care-
fully lean the panel on the Crossarms, being careful not to damage the edges of the
panel.
If the panel will be installed on a flat ceiling, tilt the Cradle back to its level position and
lock the Tilt latch. If the panel will be installed on a side wall or sloped ceiling, leave
the Cradle tilted.
Raise the Backstop, and carefully roll the Lift near to the position where the panel will
be installed.
1.
2.
3.
4.
1.
2.
3.
4.
5.
6.
7.