Chamberlain HS670 Safety Gate User Manual


 
13
IMPORTANT NOTE: On three phase operators, power connections
must be properly phased. If phased incorrectly, the gate operator
will run reversed. To correct this situation, shut off power at main
power source and at the operators electrical disconnect switch.
Then reverse any two of the three power leads.
REMOTELY MOUNTED STOP/RESET CONTROL WIRING
(REQUIRED)
• This control will function as a Stop/Reset command and is to be
wired within line of sight of the gate.
• Wire Stop/Reset control station to terminals 3 and 5 on the
control box on the operator. Make sure that all Stop/Reset
controls are wired in series.
ON/OFF SWITCH POWER WIRING
NOTES:
Before running power wiring refer to wiring specifications on
previous page for correct wire gauges.
Secure all electrical power connections inside the disconnect
switch electrical box. Refer to electrical wiring diagram on pages
30 and 31.
On/Off Switch
Cover
Wire Nut
Connections
(see instructions)
Power Wiring
Conduit
SINGLE PHASE
All single phase 115V/230V operators will have the
following:
L1 WHITE
L2 BLACK
GROUND, GREEN
THREE PHASE
All three phase operators will have the following:
L1 BLACK
L2 BLACK
L3 BLACK
GROUND, GREEN
123
12345
6
7
Control
Conduit
Stop/Reset
Button
Control
Conduit
Stop/Reset
Button
WIRING