Adams CFW 60 Building Set User Manual


 
3.3 SETTING UP THE SCALES
The pillar is attached to the base using a bracket that must be
attached to the base frame first using the 4 bolts supplied. The pillar
is secured to the bracket using 2 sets of screws. The cable from the
base to the indicator module is run through the tube and taken out
through the plastic support at the top. Excess cable can be stored
within the tube.
The CFW Series comes with a stainless steel platform packed
separately. Place the platform in the base.
Level the scale by adjusting the four feet. If the scale rocks re-adjust
the feet.
Attach the indicator module to the pillar by sliding it over the bracket
with the flanges engaged in the groves on the base. Attach the
cable from the base to the connector on the rear of the indicator.
Attach the power supply module to the connector on the side of the
indicator. Press the [On/Off] key. The software revision number will
be displayed followed by a self-test showing all digits before the zero
is displayed along with the unit of weight that was selected last.
@Adam Equipment Company 2006
7