Chamberlain LA412-S Safety Gate User Manual


 
6
JUNCTION BOX
The following items are required to complete the junction box installation:
• 4 x 4 Junction Box with 3/4" NPT threaded port holes
• Screws
• PVC Conduit
Open the junction box by removing screws (4) and set aside.
Mount the junction box within 5' of second operator.
Junction Box
Cover
Junction Box
Moving Gate Can Cause
In
jury or Death
KEEP CLEAR!
G
ate may move at any
time without pr
i
or warning.
Do no
t let
children o
perat
e the gat
e or
play in the gate area.
This entr
ance is f
or vehicles o
nly
Pedest
rians must use separate entran
ce
Control Box
Gate Operator (Gate 1)
Gate Operator (Gate 2)
Extension Cable
Within 5’
Within 5' PVC conduit
(not provided) to protect
the power cable for solar
panel and low voltage
wire from lawn mowers
and string trimmers.
25 Wiring
Junction Box
Solar Panel
(facing South)
Screws (4)