Chamberlain LA412-S Safety Gate User Manual


 
3
MEASURING AND MARKING FOR THE GATE BRACKET
Before proceeding, begin with the gate in the fully closed position. There are two methods for determining the
proper location of the post brackets:
• Paper template (located on the back page of this manual. Must be cut out.)
• Tape measure.
Either method will work depending on preference.
NOTE: Be sure gate is in the closed position before proceeding.
Template Method
Place the template (provided on the back page) under the gate hinge point. Use a screwdriver or dowel rod to
temporarily mark the location in front of the gate post.
LEFT SIDE BRACKET MOUNTING
Gate Post
Gate Hinge Point
TOP VIEW
Gate Post
Use a screwdriver or dowel rod to
temporarily mark measurement.
RIGHT SIDE BRACKET MOUNTING
Gate Hinge Point
Gate Post
Gate Post
Use a screwdriver or dowel rod to
temporarily mark measurement.
TOP VIEW
Tape Measure Method
Place the measuring tape under the gate hinge point and measure 7". Use a screwdriver or dowel rod to
temporarily mark the location of the fi rst measurement.
LEFT SIDE BRACKET MOUNTING
X
Gate Post
Gate Hinge Point
Gate Post
7"
X
Gate Post
Gate Hinge Point
Gate Post
7"
RIGHT SIDE BRACKET MOUNTING
Measure 7" from the previous mark.
X
Gate Post
Gate Hinge Point
7"
X
Gate Post
Gate Hinge Point
7"
Use the screwdriver or dowel rod to mark the location of the second measurement.
X
Gate Post
Gate Hinge Point
First Marking
X
Gate Post
Gate Hinge Point
First Marking
13 Installation