78-0013-4441-1-D 7
3M
™
One Pass Mini Fiber Pathway
7.3 After exposing appropriate length of fiber for
termination, attach duct by aligning the end of the
duct with the recessed area in the base. Remove the
liner and press firmly into place.
DO NOT ROUTE the 900 µm fiber into the outlet box until
installation of the duct and termination of the connector is
complete.
Align end of duct in recess
8.0 Duct Installation
8.1 Installation Tool
No duct on these wheels
Duct profile wheels
Reference surface guides
Belt clip
8.2 Installing the duct
Straight away from wall
Remove liner as you go
Firm pressure
10-30°
• The reference surface guides should maintain contact
with reference surface during installation
• Hold duct at same height as duct installation path
• Hold duct out approximately 10-30° from wall
• Do not overstretch duct during installation
• Use firm pressure to securely attach duct to installation
surface
9.0 Exterior and Interior Corner Installation
9.1 Exterior Corner: Install duct around corner using
firm pressure.
Note: Do not overstretch duct.
9.2 a) Interior corner: Use wheel of installation tool to
ensure proper bend radius.
Note: Do not overstretch duct or allow adhesive to make
contact with the next wall until the corner is complete!
Use wheel of
installation tool to ensure
proper bend radius
Do not let adhesive
touch wall
b) Traverse corner with tool and continue duct
application.