A SERVICE OF

logo

I FIGURE 6
STEP 6:
¯
Insert two 2 X 3" END CAPS (34) into the TOP BOOM (2) as shown in FIGURE
Route threaded end of the LAT CABLE (15) through the TOP BOOM (2) as shown in FIGURE
SECURELY assemble two 3-1/2" PULLEYS (12) to the TOP BOOM (2) using two 3/8 X 2-3/4" BOLTS (25), four
FLANGE SPACERS (33), and two 3/8" LOCK NUTS (32). See FIGURE 6. (NOTE: BEFORE TIGIITENING, MAKE
CABLE (15) IS IN TIlE GROOVES OF TIlE PULLEYS.)
¯ Insert two GUIDE ROD BUSHINGS (20) into the BUSHINGS of the TOP BOOM (2) as shown in FIGURE
STEP 7
LOOSELY assemble two 3-1/2" PULLEYS (12) to two 1-3/4"
5-1/4" PLATES (17) using two 3/8 X 2" BOLTS (24) and 3/8"
LOCK NUTS (32) as shown in FIGURE
FIGURE 7
~3/8 X 2"
0
1 2 3
1/2
1/2