18
INSTALLATION INSTRUCTIONS
COMMISSIONING
1.1 Having run the gas supply to the stove:
• Purge the Supply Pipe to expel any debris blocking the gas
controls
• Connect the gas supply to the 8mm compression elbow at
the RH rear of the stove, see diagram 1
1.2 • Connect suitable pressure gauge to the test point on inlet
fitting
• Turn gas supply on
• Light and check all gas joints and seals for leaks
•Turn to maximum and check gas supply pressure as stated
on the data badge
• Turn gas off and replace the test point screw
• Turn gas on and check test point for leaks
1.3 • Check that you have complied with the Installation
Instructions and any local regulations
• Complete the Appliance Commissioning Checklist at front
of Instructions and explain the operation of the appliance to
the user
• Hand the completed instructions to the user for safe
keeping, as this information is required when making any
guarantee claims.
1
1. COMMISSIONING