22 SPARC Enterprise T5140 and T5240 Servers Installation Guide February 2008
To Insert and Lock the Server in the Rack
1. Deploy the antitilt bar, if the chassis or rack is so equipped.
Caution The weight of the servers on extended slide rails can be enough to
overturn an equipment rack.
Caution The 2U server weighs approximately 46 lb (20.7 kg). Two people are
required to lift and mount the server into a rack enclosure when using the
procedures in this chapter.
2. Insert the ends of the mounting brackets into the sliding rails (
FIGURE 2-7).
FIGURE 2-7 Mounting the Chassis on the Slide Rails (Either Server)