15
CHAPTER
2
Installing the SPARC Enterprise
T5140 and T5240 Servers
This chapter provides instructions for installing the servers into an equipment rack.
Note – If your rackmount kit came with its own instructions, use the instructions in
your rackmount kit instead of the instructions in this chapter. After performing the
server installation, proceed to Chapter 3 for first-time power on.
This chapter contains the following sections:
■ “Installing the Servers in a Rack” on page 15
■ “Installing the Cable Management Arm for Both Servers” on page 24
■ “Connecting the Server Cables for Both Servers” on page 31
■ “Managing Cables With the CMA” on page 34
■ “Dismounting the Servers” on page 35
Note – References to left and right are from your viewpoint as you face either the
front or rear of the equipment.
Installing the Servers in a Rack
Note – Ensure that you have all of the parts in the rackmount kit before you begin
the installation of the server.