22
GS748T Gigabit Smart Switch
Step 3: Check the Installation
Before applying power to the switch, perform the following steps:
• Inspect the equipment thoroughly.
• Verify that all cables are installed correctly.
• Check cable routing to make sure cables are not damaged or creating a safety hazard.
• Ensure all equipment is mounted properly and securely.