Linear SWR Safety Gate User Manual


 
SWR SWC SWD Swing Gate Operator Installation Guide - 30 - 227965 Revision X13 3-28-2008
INSTALLER CUSTOMER
Customer’s Signature
Installer’s Signature
Date
Date
Gate Operator Installation Checklist
1. The gate has been checked to make sure it is level and moves freely in both directions.
2. Potential pinch areas have been guarded so as to be inaccessible OR have
contact and/or non-contact obstruction sensing devices installed.
3. The installer has installed one or more contact or non-contact obstruction sensing
devices, in compliance with UL325 requirements for this installation.
4. If pedestrian traffi c is expected, a separate pedestrian gate has been
installed, a minimum of seven feet from the gate. The customer has been
informed that all pedestrian traffi c must use the pedestrian gate.
5. Warning signs have been installed on each side of the gate in highly visible locations.
The customer has been informed that these signs must remain at all times.
6. There are no controls installed on the gate operator, or within seven feet of the gate.
7. The installer has properly adjusted the obstruction sensing feature and has tested
the gate to make sure that the gate stops and reverses a short distance with minimal
resistance applied (40 lbs. on a swing gate at the end of the gate, 75 lbs. on a slide gate)
8. The installer has instructed the customer in the proper use of the gate operator and reviewed
all of the operational functions, obstruction sensing devices, warning beeper and reset, etc.
9. The installer has instructed the customer in the proper use of the operator’s
manual disconnect feature. The manual disconnect must never be used
while the gate is in motion. The power switch must be turned off before
using the manual disconnect and disengaging the operator.
10. The installer has reviewed all safety instructions with the customer, and has left
the safety instructions and owner’s information sheets for their reference.
11. The installer has answered any questions the customer has regarding the
operation of the gate operator and gate operator safety precautions.
12. The installer has explained to the customer that a regular maintenance
schedule for both the gate and the gate operator is recommended.
By signing this installation checklist, I/we hereby certify that each item listed and checked above has been covered by the
installer and is clearly understood by the customer.