Teledyne 05386D Table Top Game User Manual


 
Model 200EU-NOy Option Manual Addendum
05386 Rev. D 9
2.3 Initial Operation
1. After confirming proper supply voltage, turn on the instrument power. If you are
unfamiliar with the M200EU with NOy Option, we recommend that you read the
overview in Section 3 before proceeding.
The power indicator light and display should immediately light, in addition the bypass
pump should start up. The Bypass Pump Chassis requires about 30 minutes for the
converter to come up to temperature.
While the converter is coming up to temperature, the M200EU analyzer should be
powered-up. Also, follow the instructions in the M200E Manual and the M200EU
Addendum to confirm proper operation of that instrument. Note: It will take 30
minutes for the ozone generator to start up in the M200EU. During that time the
instrument will not respond to span gas.
After 30 min, the display on the Bypass Pump Chassis should read 315
o
C, indicating
that the converter is up to temperature.
2. Proceed to Section 4 of this manual to do a Zero/Span check.
Table 1 Final Test and Calibration Values
Test Values Observed Value Units Nominal Range
CONVERTER TEMP
o
C
315 7
BYPASS FLOW – NO CHANNEL CC/MIN
800 80
BYPASS FLOW – NOy CHANNEL CC/MIN 800 ± 80
Converter Serial # __________________________
Date _______________________ Technician _____________________