Pelco C1459M-B (2/03) Crib Toy User Manual


 
INSTALLATION
There are two methods of installation for the metal ceiling panel.
Replacement Installation – Remove existing ceiling tile and install the SD5-P metal panel.
Reinforcement Installation – Install the SD5-P to strengthen the existing ceiling tile.
Select the method of installation, and then refer to the following sections for installation instructions.
REPLACEMENT INSTALLATION
1. Remove the ceiling tile from the ceiling.
2. Remove the conduit fitting, lock nut, and safety chain bracket from the parts bag that came with the back box, and attach them to the back box
as shown in Figure 1.
Figure 1. Installation of Conduit Fitting, Lock Nut, and Safety Chain Bracket
3. Install the back box in the metal panel by compressing the spring clips and pushing the back box through the hole. Tighten the screws until you
hear a clicking noise.
4. Install the metal panel in the ceiling.
5. Attach a T-rail clip (supplied with the SD5-P) on each side of the metal panel as shown in Figure 2.
T-RAIL CLIP
T-RAIL CLI
P
METAL PANEL
Figure 2. T-Rail Clip Installation