PAGE 18 — WM45HCE PLASTER/MORTAR MIXER • OPERATION AND PARTS MANUAL — REV. #0 (02/04/13)
ENGINE MAINTENANCE
Perform engine maintenance procedures as referenced by Table 5 below:
Table 5. Engine Maintenance Schedule
Description (3) Operation Before
First
Month or
10 hrs
Every 3
Months or
25 hrs
Every 6
Months or
50 hrs
Every
Year or
100 hrs
Every 2
Years or
200 hrs
Engine Oil
CHECK X
CHANGE X
Air Cleaner
CHECK X
CHANGE X (1)
All Nuts and
Bolts
Re-tighten If
Necessary
X
Spark Plug
CHECK-CLEAN X
REPLACE X
Cooling Fins CHECK X
Spark Arrester CLEAN X
Fuel Tank CLEAN X
Fuel Filter CHECK X
Idle Speed CHECK-ADJUST X (2)
Valve Clearance CHECK-ADJUST X (2)
Fuel lines CHECK Every 2 years (replace if necessary) (2)
1. Service more frequently when used in DUSTY areas.
2. These items should be serviced by your service dealer, unless you have the proper tools and are mechanically
proficient. Refer to the HONDA shop Manual for service procedures.
3. For commercial use, log hours of operation to determine proper maintenance intervals.
NOTICE
Reference manufacturer engine manual for specific
servicing instructions.
MAINTENANCE (ENGINE)