6 – Wiring (continued)
6-7 AC Input/Output Wiring (Single UPS)
After de-energizing all input and output (AC and DC) of the UPS
system, remove the terminal block cover from the UPS system.
If you did not connect the ground cable in
Section 6-6, connect the
UPS system’s grounding terminal
A
to your facility’s earth ground
B
with a 4 AWG (5.189 mm) ground cable. Keep the ground cable
connected at all times after installation.
Remove the UPS system’s front bezel to expose the circuit breaker.
First, confirm that the main input circuit breaker switch
A
and
the bypass input circuit breaker switch
B
are both off. Second,
confirm that the manual bypass circuit breaker switch
C
is off.
Third, confirm that the output circuit breaker switch
D
is off.
Confirm the phase of each cable, then connect the cables according
to the UPS system terminal block diagram in
Section 6-3. See
Section 6-5 for cable size requirements. Cabling should be
protected by flexible conduit and routed through the appropriate
knockouts in the terminal block cover. Warning: Observe proper
phase by connecting R to R, S to S, T to T and N to N. Failure
to observe proper phase will damage the UPS system and
create a risk of personal injury and property damage.
Replace the UPS system’s terminal block cover.
1
1
2
4
5
2
3
4
5
Main
Input
O
OFF
O
OFF
O
OFF
O
OFF
A
3
Front Panel
B
A
Back Panel
B C D
200803004 93-2793 SU80k manual 4C.indd E15200803004 93-2793 SU80k manual 4C.indd E15 6/16/2008 1:43:19 PM6/16/2008 1:43:19 PM