A SERVICE OF

logo

FIGURE 14
STEP 14:
¯ SECURELY assemble the BEARING HOUSING (13) and the CENTER PULLEY BRACKET (16) to the UPRIGHT FRAM~
using two 1/2 X 3-1/4" BOLTS (26) and two 1/2" LOCKN’t~S (34) as shown in FIGURE
STEP 15:
¯ Insert fot~ 2" SQ. END CAPS (47) into the LEFT (15) & RIGHT
PEC ARMS as shown in FIGURE 15.
Slide two 4 X 12" ROLLER PADS (21) onto the LEFT (15) & RIGHT
(14) PEC ARMS as shox~ in FIGURE 15. (TIP: Spray window
cleaner on the inside of the roller pad to help ease assembly.)
11
FIGURE 15