![](https://pdfstore-manualsonline.prod.a.ki/pdfasset/3/dd/3dd9e874-cd2e-460b-888c-d7e8191c8ca6/3dd9e874-cd2e-460b-888c-d7e8191c8ca6-bg1d.png)
Installing the NetAXS-123 Panels
Installation
NetAXS-123 Access Control Unit Installation Guide, Document 800-05779, Revision A 21
4. Select one of the following three possible entry points for the power cable:
Warning: Do not apply power at this time. Be sure the power cable is disconnected from the
external power source before following this step.
• Through the bottom conduit
knockout, which directly connects
AC power to the terminal block.
• Through the side conduit knockout,
which also directly connects AC
power to the terminal block.
• Through the optional AC input
receptacle. Note: the brown and blue
wires must be twisted together from
the point of entry at the AC input
receptacle to the Terminal Block.