Table A-5 Power Dissipation and Air Conditioning Requirement Summary
Component Quantity
Multiply Qty.
by Watts value
then divide
total Watts by
0.7
a
a. For example, if you have two bc1100 blades the calculation for this would be:
(2 x 23.6 Watts)/0.7 = 67.43 Watts.
Power
Dissipated
(expressed in
kilowatts)
Air
Conditioning
Required
(expressed in
tons)
b
b. Air Conditioning Required = kilowatts/3.517 = tons needed
Chassis 1 Watts = 0 Watts = 0 0.0
HP Server
bc1100
1 to 16
Network
Blade
1 or 2
Management
Blade
1
Management
LAN Blade
1 or 2
Power Supply
c
c. The power supply thermal load is included in the value calculated for the
blades. The power supply efficiency is 0.7 so when you divide by 0.7, the
resulting value represents the thermal load of the blade plus the thermal
load in the supply due to each blade.
2 Accounted for
(see footnote)
Accounted for
(see footnote)
Accounted for
(see footnote)
Totals N/A N/A