A SERVICE OF

logo

Installation Instructions MSBU / PSBU
5
INSTALLATION
WARNING: IMPROPER INSTALLATION CAN LEAD TO
MOUNT FALLING CAUSING SERIOUS PERSONAL
INJURY OR DAMAGE TO EQUIPMENT! DO NOT substitute
hardware. Only use hardware provided or specified by
manufacturer.
1. Determine and mark the vertical center position between
the Left side Upper and Lower mounting holes in display.
(See Figure 1)
2. Determine and mark the vertical center position between
the Right side Upper and Lower mounting holes in display.
(See Figure 1)
3. Orient vertical mounting bracket (T) so that mounting holes
are on top and mounting slots are on bottom. (See Figure 1)
4. Align mounting holes in vertical mounting bracket (T) with
upper and lower mounting holes in display.
5. Adjust vertical mounting bracket (T) position until mark
made in step 1 aligns with center mark in vertical mounting
bracket (T).
6. Secure Left side vertical mounting bracket (T) to display
using two flat washer (R), and Phillips pan head screws
(B through M). (See Figure 2)
NOTE: If the display has a recessed mounting surface,
protrusions or a power box, a spacer and longer
mounting hardware must be placed between the
display and vertical mounting bracket (T).
(See Figure 2)
7. Repeat steps 3 through 6 for Right side vertical mounting
bracket using the same hole locations to align brackets
horizontally.
Figure 1
4
1
(T) x 2
Mounting holes
Mounting Slots
Figure 2
4
3
(T) x 2
(N,O,P, or Q)) x 4
(R) x 4
(B through M)
x 4
(used with E through M)