Fig. 3 — Unit Label Diagram — 06D,07D Units
AUX —
Auxiliary
C—
Compressor Contactor
CH —
Crankcase Heater
CR —
Control Relay
DX —
Direct Expansion
EQUIP —
Equipment
FU —
Fuse
GND —
Ground
HPS —
High-Pressure Switch
IP —
Internal Protector
LLS —
Liquid Line Solenoid Valve
LPS —
Low-Pressure Switch
M3 —
Cooling Tower Fan
NEC —
National Electrical Code
OL —
Overload
OPS —
Oil-Pressure Switch
POR —
Pumpout Relay
SW —
Start-Stop-Reset Switch
LEGEND
TB —
Terminal Block
TM —
Timer Motor
TR —
Timer Relay
Terminal Block Connector
Unmarked Terminal
Marked Terminal
Factory Wiring
Field Control Wiring
To indicate common potential only;
not to represent wiring.
Splice
NOTES:
1. Factory wiring is in compliance with NEC. Any field modifications
or additions must be in compliance with all applicable codes. Use
copper, copper-clad aluminum for field power supply only.
2. Field power supply wiring must be 75 C minimum.
3. Compressor thermally protected. Three-phase motors are pro-
tected against primary single-phasing condition.
4. Pilot duty control must be field supplied. Minimum contact rating
must be 25 va.
5. 60 Hz units have 120-volt control circuit. 50 Hz units have
230-volt control circuit. A separate source of supply at the correct
voltage must be field supplied through a fused disconnect device
with a maximum rating of 15 A to TB2 connections
(Hot Side) and (Neutral).
6. Open control circuit disconnect switch for servicing only. Discon-
nect must remain closed for crankcase heater to operate.
7. A transformer of the following rating may be field supplied for
60 Hz units: 350 va.
8. Transformer must be fused and grounded per applicable codes.
9. If any of the original wiring furnished must be replaced, it must
be replaced with 90 C wire or its equivalent.
L1
L2