A SERVICE OF

logo

INSTALLATION
Page 3-3
To stack SEHs together, refer to Figure 3-1 and perform the following
steps:
1. Attach the SEH HubSTACK Interconnect cable to the bus port
labeled “OUT” on the rear panel of the SEH.
2. Attach the other end of SEH HubSTACK Interconnect cable to the
bus port labeled “IN” on the rear panel of the SEH next in the stack.
3. Attach up to four SEH hubs in the stack repeating steps 1 and 2.
Figure 3-1. Stacking the SEH
To stack an SEH to an SEHI, refer to Figure 3-1 and perform the
following steps:
1. Attach the SEHI HubSTACK Interconnect cable to the bus port
labeled “OUT” on the rear panel of the SEHI.
2. Attach the other end of SEHI HubSTACK Interconnect cable to the
bus port labeled “IN” on the rear panel of the SEH next in the stack.
SEH-24 10BASE-T HUB WITH LANVIEW®
OUT
SEH INTERCONNECT
IN
SEH-24 10BASE-T HUB WITH LANVIEW®
OUT
SEH INTERCONNECT
IN
SEH-24 10BASE-T HUB WITH LANVIEW®
OUT
SEH INTERCONNECT
IN
OUT
SEH INTERCONNECT
IN
SEH-24 10BASE-T HUB WITH LANVIEW®
OUT
SEH INTERCONNECT
IN
SEH-24 10BASE-T HUB WITH LANVIEW®
SEH INTERCONNECT
OUT
SEHI-24 10BASE-T HUB WITH LANVIEW®
SEH-24 10BASE-T HUB WITH LANVIEW®
OUT
SEH INTERCONNECT
IN
SEH-24 10BASE-T HUB WITH LANVIEW®
OUT
SEH INTERCONNECT
IN
SEH-24 10BASE-T HUB WITH LANVIEW®
OUT
SEH INTERCONNECT
IN
SEH-24 10BASE-T HUB WITH LANVIEW®
OUT
SEH INTERCONNECT
IN