Fisher-Price BMD99 Dollhouse User Manual


 
2
Assembly
• At an angle, fit the bottom of one end of the bridge post onto the building support,
as shown.
• Push to “snap” the top of the same end of the bridge post in place.
• Repeat this procedure to assemble the other end of the bridge to the other building.
The vault door and ramp are designed to break away from the product. If they fall off,
simply follow the steps below to reassemble.
• At an angle, fit the bottom of the vault door into the post on the building. Push to
snap” the top of the door in place.
• At an angle, fit one side of the ramp into the groove on the building. Push to “snap
the other side of the ramp in place.
BACK VIEW
FRONT VIEW
Vault Door
Ramp
Ramp